It looks like you're a bot or automated crawler (sorry if you're not).
We don't generate full content for automated requests.
For the full experience, please visit with a regular browser.
Article 1: Subject matter
Article 2: Scope
Article 3: Definitions
Article 4: Objectives and regulatory aspects
Article 5: Terms and conditions or methodologies of TSOs
Article 6: Approval of terms and conditions or methodologies of TSOs
Article 7: Amendments to the terms and conditions or methodologies of TSOs
Article 8: Publication on internet
Article 9: Recovery of costs
Article 10: Stakeholder involvement
Article 11: Public consultation
Article 12: Confidentiality obligations
Article 13: Agreements with TSOs not bound by this Regulation
Article 14: Monitoring
Article 15: Annual report on operational security indicators
Article 16: Annual report on load-frequency control
Article 17: Annual report on regional coordination assessment
Article 18: Classification of system states
Article 19: Monitoring and determination of system states by TSOs
Article 20: Remedial actions in system operation
Article 21: Principles and criteria applicable to remedial actions
Article 22: Categories of remedial actions
Article 23: Preparation, activation and coordination of remedial actions
When a TSO activates a remedial action each impacted transmission-connected significant grid user and DSO shall execute the instructions given by the TSO
Article 24: Availability of TSO's means, tools and facilities
Article 25: Operational security limits
Article 26: Security plan for critical infrastructure protection
Article 27: Obligations of all TSOs regarding voltage limits
Article 28: Obligations of SGUs concerning voltage control and reactive power management in system operation
Article 29: Obligations of all TSOs concerning voltage control and reactive power management in system operation
Article 30: Short-circuit current
Article 31: Short-circuit current calculation and related measures
Article 32: Power flow limits
Article 33: Contingency lists
Article 34: Contingency analysis
Article 35: Contingency handling
Article 36: General requirements on protection
Article 37: Special protection schemes
Article 38: Dynamic stability monitoring and assessment
Article 39: Dynamic stability management
Article 40: Organisation, roles, responsibilities and quality of data exchange
Article 41: Structural and forecast data exchange
Article 42: Real-time data exchange
Article 43: Structural data exchange
Article 44: Real-time data exchange
Article 45: Structural data exchange
Article 46: Scheduled data exchange
Article 47: Real-time data exchange
Article 48: Structural data exchange
Article 49: Scheduled data exchange
Article 50: Real-time data exchange
Article 51: Data exchange between TSOs and DSOs concerning significant power generating modules
Article 52: Data exchange between TSOs and transmission-connected demand facilities
Article 53: Data exchange between TSOs and distribution-connected demand facilities or third parties participating in demand response
Article 54: Responsibility of the SGUs
Article 55: Tasks of TSOs regarding system operation
Article 56: Purpose and responsibilities
Article 57: Performing operational tests and analysis
Article 58: Training program
Article 59: Training conditions
Article 60: Training coordinators and trainers
Article 61: Certification of system operator employees in charge of real-time operation
Article 62: Common language for communication between the system operator employees in charge of real time operation
Article 63: Cooperation between TSOs on training
Article 64: General provisions regarding individual and common grid models
Article 65: Year-ahead scenarios
Article 66: Year-ahead individual grid models
Article 67: Year-ahead common grid models
Article 68: Updates of year-ahead individual and common grid models
Article 69: Week-ahead individual and common grid models
Article 70: Methodology for building day-ahead and intraday common grid models
Article 71: Quality control for grid models
Article 72: Operational security analysis in operational planning
Article 73: Year-ahead up to and including week-ahead operational security analysis
Article 74: Day-ahead, intraday and close to real-time operational security analysis
Article 75: Methodology for coordinating operational security analysis
Article 76: Proposal for regional operational security coordination
Article 77: Organisation for regional operational security coordination
Article 78: Regional operational security coordination
Article 79: Common grid model building
Article 80: Regional outage coordination
Article 81: Regional adequacy assessment
Article 82: Outage coordination objective
Article 83: Regional coordination
Article 84: Methodology for assessing the relevance of assets for outage coordination
Article 85: Lists of relevant power generating modules and relevant demand facilities
Article 86: Update of the lists of relevant power generating modules and relevant demand facilities
Article 87: Lists of relevant grid elements
Article 88: Update of the list of relevant grid elements
Article 89: Appointment of outage planning agents
Article 90: Treatment of relevant assets located in a distribution system or in a closed distribution system
Article 91: Variations to deadlines for the year-ahead outage coordination
Article 92: General provisions on availability plans
Article 93: Long-term indicative availability plans
Article 94: Provision of year-ahead availability plan proposals
Article 95: Year-ahead coordination of the availability status of relevant assets for which the outage planning agent is not a TSO taking part in an outage coordination region, nor a DSO or a CDSO
Article 96: Year-ahead coordination of the availability status of relevant assets for which the outage planning agent is a TSO taking part in an outage coordination region, a DSO or a CDSO
Article 97: Provision of preliminary year-ahead availability plans
Article 98: Validation of year-ahead availability plans within outage coordination regions
Article 99: Final year-ahead availability plans
Article 100: Updates to the final year-ahead availability plans
Article 101: Management of the ‘testing’ status of relevant assets
Article 102: Procedure for handling forced outages
Article 103: Real-time execution of the availability plans
Article 104: Forecast for control area adequacy analysis
Article 105: Control area adequacy analysis
Article 106: Control area adequacy up to and including week-ahead
Article 107: Control area adequacy in day-ahead and intraday
Article 108: Ancillary services
Article 109: Reactive power ancillary services
Article 110: Establishment of scheduling processes
Article 111: Notification of schedules within scheduling areas
Article 112: Coherence of schedules
Article 113: Provision of information to other TSOs
Article 114: General provisions for ENTSO for Electricity operational planning data environment
Article 115: Individual grid models, common grid models and operational security analysis
Article 116: Outage coordination
Article 117: System adequacy
Article 118: Synchronous area operational agreements
Article 119: LFC block operational agreements
Article 120: LFC area operational agreement
Article 121: Monitoring area operational agreement
Article 122: Imbalance netting agreement
Article 123: Cross-border FRR activation agreement
Article 124: Cross-border RR activation agreement
Article 125: Sharing agreement
Article 126: Exchange agreement
Article 127: Frequency quality defining and target parameters
Article 128: FRCE target parameters
Article 129: Criteria application process
Article 130: Frequency quality evaluation data
Article 131: Frequency quality evaluation criteria
Article 132: Data collection and delivery process
Article 133: Synchronous area monitor
Article 134: LFC block monitor
Article 135: Information on load and generation behaviour
Article 136: Ramping period within the synchronous area
Article 137: Ramping restrictions for active power output
Article 138: Mitigation
Article 139: Basic structure
Article 140: Process activation structure
Article 141: Process responsibility structure
Article 142: Frequency containment process
Article 143: Frequency restoration process
Article 144: Reserve replacement process
Article 145: Automatic and manual frequency restoration process
Article 146: Imbalance netting process
Article 147: Cross-border FRR activation process
Article 148: Cross-border RR activation process
Article 149: General requirements for cross-border control processes
Article 150: TSO notification
Article 151: Infrastructure
Article 152: System states related to system frequency
Article 153: FCR dimensioning
Article 154: FCR technical minimum requirements
Article 155: FCR prequalification process
Article 156: FCR provision
Article 157: FRR dimensioning
Article 158: FRR minimum technical requirements
Article 159: FRR prequalification process
Article 160: RR dimensioning
Article 161: RR minimum technical requirements
Article 162: RR prequalification process
Article 163: Exchange of FCR within a synchronous area
Article 164: Sharing of FCR within a synchronous area
Article 165: General requirements for the exchange of FRR and RR within a synchronous area
Article 166: General requirements for sharing FRR and RR within a synchronous area
Article 167: Exchange of FRR within a synchronous area
Article 168: Sharing of FRR within a synchronous area
Article 169: Exchange of RR within a synchronous area
Article 170: Sharing of RR within a synchronous area
Article 171: General requirements
Article 172: Frequency coupling between synchronous areas
Article 173: Exchange of FCR between synchronous areas
Article 174: Sharing of FCR between synchronous areas
Article 175: General requirements for sharing of FRR and RR between synchronous areas
Article 176: Exchange of FRR between synchronous areas
Article 177: Sharing of FRR between synchronous areas
Article 178: Exchange of RR between synchronous areas
Article 179: Sharing of RR between synchronous areas
Article 180: Cross-border activation process for FRR/RR
Article 181: Time control process
Article 182: Reserve providing groups or units connected to the DSO grid
Article 183: General transparency requirements
Article 184: Information on operational agreements
Article 185: Information on frequency quality
Article 186: Information on the load-frequency control structure
Article 187: Information on FCR
Article 188: Information on FRR
Article 189: Information on RR
Article 190: Information on sharing and exchange
Article 191: Amendments to contracts and general terms and conditions
Article 192: Entry into force
Articles 41 to 53 shall apply 18 months after the entry into force of this Regulation. Where other articles foresee the provision or use of data as described in Articles 41 to 53, in the period between entry into force of this Regulation and Articles 41 to 53 becoming applicable, the latest available equivalent data shall be used, in a data format as determined by the entity responsible for the delivery of data, unless otherwise agreed.
Article 54(4) shall apply as of the date of application of Article 41(2) of Commission (EU) 2016/631 and as of the date of application of Article 35(2) of Regulation (EU) 2016/1388.
Recital 1
Recital 2
Recital 3
Recital 4
Recital 5
Recital 6
Recital 7
Recital 8
Recital 9
Recital 10
Recital 11
Recital 12
Recital 13
Recital 14
Recital 15
Recital 16
Recital 17
Recital 18
Provisions not applicable to the TSOs of Lithuania, Latvia and Estonia in accordance with Article 2(4):
Voltage ranges referred to in Article 27:
Table 1 Table 1
Voltage ranges at the connection point between 110 kV and 300 kV Voltage ranges at the connection point between 110 kV and 300 kV
Table 2 Table 2
Voltage ranges at the connection point between 300 kV and 400 kV Voltage ranges at the connection point between 300 kV and 400 kV
Frequency quality defining parameters referred to in Article 127:
Table 1 Table 1
Frequency quality defining parameters of the synchronous areas Frequency quality defining parameters of the synchronous areas
Table 2 Table 2
Frequency quality target parameters of the synchronous areas Frequency quality target parameters of the synchronous areas
FRCE target parameters referred to in Article 128:
Table Table
FRCE target parameters for GB and IE/NI FRCE target parameters for GB and IE/NI
FCR technical minimum requirements referred to in Article 154:
Table Table
FCR properties in the different synchronous areas FCR properties in the different synchronous areas
Limits and requirements for the exchange of FCR referred to in Article 163:
Table Table
Limits and requirements for the exchange of FCR Limits and requirements for the exchange of FCR
Requirements and limits for the exchange of FRR within the synchronous area referred to in Article 167:
Table Table
Requirements and limits for the exchange of FRR within a synchronous area Requirements and limits for the exchange of FRR within a synchronous area
Requirements and limits for the exchange of RR within the synchronous area referred to in Article 169:
Table Table
Requirements and limits for the exchange of RR within the synchronous area Requirements and limits for the exchange of RR within the synchronous area
Footnote p0: This Regulation shall be binding in its entirety and directly applicable in all Member States.
Done at Brussels, 2 August 2017.